lionhart
Member
on wiki it state's september 2012.
millimole said:Well, the interesting bit on that French site is the list of planned changes (at the end of the arrticle) to the range, including a new diesel, and deisel hybrid, and petrol hybrid engines; increase in power of the 200 to 210. And, a change to the range planned for 2015.
There will, it seems be LED DRLs (on notera l’apparition de feux à jour à leds)
All appearing some months after these changes come on the 308.
In the comments there is speculation about where this infor actually originates, and there is a question / comment that the photo is a Photoshopped unofficial picture.
Correct as this ties in with "factory shut down" So any new jigs ect can be installed at the factory during the shut down period. However I go along with joske. This was always to be a limited production run and so it is more likely that specials will be the concluding models.RCZ1 said:Not necessarily. 2013 builds will usually start to be built September / October onwards I believe so still time.